Building emission rate BER
The Building Regulations set out requirements for specific aspects of building design and construction. Regulation 26 of the building regulations states that “Where a building is erected, it shall not exceed the target CO2 emission rate for the building…”,
The target CO2 emission rate (TER) sets a minimum allowable standard for the energy performance of a building and is defined by the annual CO2 emissions of a notional building of the same size and shape to the proposed building. TER is expressed in annual kg of CO2 per m2.
The actual building emission rate (BER) for the proposed building (other than dwellings) is calculated based on its actual specification and is expressed in terms of its annual CO2 emissions of the proposed building expressed in kg/m2. The emission rate for self-contained dwellings and individual flats (excluding common areas) is determined using a different calculation, the dwelling emission rate (DER)
The BER for the proposed building must not exceed the TER.
Before construction begins, a design stage calculation must be issued to the Building Control Body (BCB), setting out the TER, and BER for the proposed building, along with details of its proposed specification.
Within 5 days of the completion of the construction, a report must be issued to the Building Control Body (BCB), setting out the TER, and BER of the completed building, along with any changes that have been made to the specification, and an energy performance certificate (EPC). These ‘as-built’ calculations require that an air-permeability test is carried out to ensure that the building envelope has been constructed to a suitably high level of workmanship so that air (and with it, heat) will not ‘leak’ through the building fabric. In addition, the BCB is likely to require a commissioning notice.
For buildings other than dwellings, the TER and BER can be calculated and the EPC produced by following the National Calculation Method (NCM). This can be done by using approved simulation software (Approved Dynamic Simulation Models (DSMs)) or by using the Simplified Building Energy Model (SBEM), a ‘simplified’ compliance tool developed by BRE, which has a user interface called iSBEM.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Air permeability testing.
- Approved documents.
- Building regulations.
- Dwelling emission rate.
- National Calculation Method.
- Simplified Building Energy Model.
- Standard Assessment Procedure.
- Target emission rate.
[edit] External references
- Planning portal: Approved document L.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.























Comments